Terms and Conditions

Terms and Conditions for the Sale, Installation, Delivery and Use of Morfloor Services

Morfloor terms and conditions for the sale, installation, delivery and use of services

The provision of all products and services by Morfloor Parquet Group, including the sale of goods, consultancy, site visits, installation, delivery and related services, shall be governed exclusively by the terms and conditions set out herein. The placement of any order by a customer, whether in person, by telephone, in writing, online or through authorised representatives, shall constitute the customer’s acknowledgement, acceptance and full commitment to all provisions of this document.

All company activities are conducted within the territory of the Islamic Republic of Iran, and this document shall, in all respects, be governed by the laws and regulations of the Islamic Republic of Iran.

Article 1 – Definitions and general provisions

1.1. In this document, the term “Company” refers to Morfloor Parquet Group.

1.2. “Customer” refers to any natural or legal person who purchases goods, receives services, places an order, enters into a contract or makes a payment to the Company.

1.3. “Contract” refers to any agreement, order, pro forma invoice, invoice, receipt, addendum, purchase order or other document indicating the purchase of goods or receipt of services from the Company.

1.4. “Goods” includes all products manufactured, customised, imported or supplied by the Company.

1.5. Unless expressly stated otherwise, the term “day” in this document refers to a working day.

1.6. Before placing an order, the Customer is required to carefully review the technical specifications, characteristics, limitations, maintenance requirements, installation capabilities and suitability of the selected product for the intended project. Should any matter remain unclear, the Customer must obtain the necessary clarification from the Company before confirming the order.

1.7. The Company’s acceptance of any order shall be valid solely within the scope of this document. Any additional condition, explanation, agreement or claim that conflicts with these terms shall only be binding if confirmed in writing by an authorised representative of the Company.

Article 2 – Technical and environmental conditions and pre-installation requirements

2.1. The initial moisture content of the subfloor shall be declared and monitored exclusively by the Customer. The Customer must provide the relevant measurements to the Company before installation.

2.2. Before installation, the Customer must ensure that all construction or renovation activities involving water, moisture, washing, mortar, cement, plaster, tiling, wet services and similar operations have been fully completed.

2.3. As wood flooring is sensitive to changes in temperature and humidity, installation must take place during the final stages of renovation or project completion.

2.4. Where the relative humidity of the environment exceeds 80%, wood tiles may be subject to deformation, expansion, warping or cupping. In such circumstances, the Customer shall be responsible for identifying and eliminating the source of moisture and correcting the environmental conditions.

2.5. If relative humidity falls below 30%, wood may shrink, resulting in gaps or separation between tiles. The Company recommends maintaining indoor relative humidity between 40% and 60%.

2.6. The recommended ambient temperature for the storage and use of parquet flooring is 18°C, with a tolerance of ±9°C.

2.7. Wood flooring may only be installed over concrete, mosaic, ceramic tiles or plywood if the substrate is level, dry and properly prepared.

2.8. The permitted substrate unevenness shall not exceed 3 mm over an area of 2 square metres.

2.9. Subfloor moisture levels must not exceed the limits specified by the Company. The stated limits are 2 centimetres for concrete, 1.8 for heated floors, and 10–12 centimetres for plywood.

2.10. Where flooring is installed over an underfloor heating system, the Customer must ensure that heat is distributed evenly across all areas and that temperature fluctuations remain within an acceptable range. Daily fluctuations in floor surface temperature must not exceed 2–4°C over a 24-hour period.

2.11. Only adhesives and installation materials approved by the Company may be used.

2.12. In renovation projects, if defects or deficiencies in the substrate are discovered during the removal of existing flooring or demolition of existing layers, all additional costs associated with repairs, preparation, delays or supplementary work shall be borne by the Customer.

2.13. The site’s ventilation and heating systems must be operational and ready for use before flooring installation begins.

2.14. All wall and ceiling plastering must be completed before installation, and the moisture content of the plaster must not exceed 8%.

Article 3 – Prices and validity of quotations

3.1. All prices quoted by the Company shall remain valid for 12 days from the date of issue, unless a different validity period is expressly stated in the pro forma invoice or in a written notice issued by the Company.

3.2. Any statement regarding warehouse stock availability reflects availability only at the time of the statement. Until the Customer’s order has been formally confirmed, no right to reserve, allocate or secure the goods shall arise.

3.3. On